Biomass reception point
ČEZ, a.s., Hodonín Power Plant
Year of implementation: 2018
Financial volume: EUR 192 thousand
PURPOSE
The subject of the implementation was the replacement of the existing screw conveyors (twin screws) with a belt conveyor including the installation of a new biomass receiving hopper. The reason for this replacement was the susceptibility of the screw conveyors to wear and tear and their costly repair or replacement. The wear is due to the presence of foreign matter in the biomass (sand, small stones, etc.) which causes high abrasion. The aim is to reduce maintenance and operating costs, as well as to prevent breakdowns in the operation of the biomass sorting and conveying line.
BASIC PARAMETERS
- Line conveying capacity 100 t/h
- Conveyed material - biomass
SCOPE OF SUPPLY
- Preparation of relevant documentation (Study, Construction Execution Documentation (DPS), DD, VD, AS BUILT)
- Complete turnkey delivery
- Supply of conveyor belt technology, crushing rollers, receiving hopper, supply of steel structures
- Installation, engineering and commissioning
- Manufacture of technology components and steel structures