Dalkia Kolín, a.s., Kolín Heating Plant

Year of implementation: 2013 – 2014

Financial volume: EUR 750 thousand

PURPOSE

The subject of the implementation was the modification of the existing coal transport routes and the addition of a new coal and biomass transport route to meet the client’s requirements. The solution consists in the application of three new belt conveyors, extension of the existing Flexowell F3 vertical conveyor and the T8, T9 belt conveyors supplementing the biomass warehouse with a material removal facility using a system of screw conveyors and one inclined belt conveyor with connection to the existing transport. The implementation includes the construction of a new substation and electrical reconstruction.

BASIC PARAMETERS

  • Conveying capacity 120 t/h coal, 10 t/h biomass
  • Conveyed material - biomass, brown coal

SCOPE OF SUPPLY

  • Preparation of relevant documentation (Study, Territorial Proceedings (DUR), Building Permit documentation (DSP), Construction Execution Documentation (DPS), DD, VD, AS BUILT documentation (DSPS))
  • Complete turnkey delivery
  • Supply of belt and screw conveyor technology, supply of new transfer tower and supply of steel structures
  • Installation, engineering and commissioning