Dalkia ČR, a.s., Heating Plant ČSA

Year of implementation: 2011

Financial volume: EUR 475 thousand

PURPOSE

The scope of the project was to construct a new biomass receiving hopper with capacity, including an auger tipping mill and an inlet to the existing coal feeding conveyor route. The implementation included the solution of the truck weighing system by means of a bridge road scale and the modification of the control system of the coal feeding operation.

BASIC PARAMETERS

  • Transport capacity 20 t/h
  • Storage capacity 120 m3
  • Conveyed material - biomass

SCOPE OF SUPPLY

  • Preparation of relevant documentation (Study, Construction Execution Documentation (DPS), DD, VD, AS BUILT)
  • Complete turnkey delivery
  • Supply of biomass storage technology, shovel milling machine, conveyor belt, strain gauge weighing and supply of steel structures
  • Installation, engineering and commissioning
  • Manufacture of technology components and steel structures