Arcelor Mittal Ostrava, s.r.o.

Year of implementation: 2015 – 2016

Financial volume: EUR 3,531 thousand

PURPOSE

The subject of the implementation was the construction of a transport route of thermal coal for the newly implemented K14 boiler. The transport route also includes transfer stations and transport bridges. The transport route consists of two branches of 1A, 2A and 1B, 2B belt conveyors.

BASIC PARAMETERS

  • Line conveying capacity 385 t/h
  • Conveyed material - thermal coal

SCOPE OF SUPPLY

  • Preparation of the relevant documentation (Construction Execution Documentation (DPS), DD, AS BUILT)
  • Complete turnkey delivery
  • Supply of conveyor belt technology, hopper and overfill clamps, steel structures
  • Installation, engineering and commissioning
  • Manufacture of technology components and steel structures